Berlin – Halle/Leipzig : Bridge work

Deutsche Bahn is carrying out bridge work and switch and track renewals on the line between Berlin and Halle/Leipzig. The line has to be completely closed for this. All stops in Lutherstadt Wittenberg will be cancelled.

Note

The adjusted timetables can already be found in the information and booking systems. Please check your connections via DB Navigator or bahn.de shortly before you start your journey.

We recommend that you use the digital travel companion in the DB Navigator app with automatic notifications of changes to your booked or bookmarked journey during the construction site period in order to always see the latest timetable planners.

App DB Navigator : information and download

The effects at a glance

  • On the Berlin – Halle – Munich and Berlin – Leipzig – Munich routes, long distance trains will run every hour.
  • Trains will continue to run between Berlin and Frankfurt.
  • The stops in Lutherstadt Wittenberg will be cancelled.

Period

26 July (9 p.m.) to 16 August (5 a.m.) 2024